Expert answer:answer questions

Solved by verified expert:Hello,I need to answer questions from the article no plagiarism please I need a unique workWhat could NASA management have done differently?What, if anything, could their subordinates have done differently?What should Roger Boisjoly have done differently (if anything)? [In answering this question, keep in mind that at his age, the prospect of finding a new job if he was fired was slim. He also had a family to support.]As a student, what do you see as your future engineering professional responsibilities in relation to both being loyal to management and protecting the public welfare?How does the implied social contract of professionals apply to this case?What professional responsibilities were neglected, if any?Should NASA have done anything differently in their launch decision procedure?
untitled.pdf

Unformatted Attachment Preview

A case study in engineering ethics on the Challenger accident
Student Handout – Synopsis
On January 28, 1986, seven astronauts were killed when the space shuttle they were piloting, the
Challenger, exploded just over a minute into flight. The failure of the solid rocket booster Orings to seat properly allowed hot combustion gases to leak from the side of the booster and burn
through the external fuel tank. The failure of the O-ring was attributed to several factors,
including faulty design of the solid rocket boosters, insufficient low temperature testing of the Oring material and the joints that the O-ring sealed, and lack of communication between different
levels of NASA management.
Organization and People Involved
Marshall Space Flight Center – in charge of booster rocket development
Larry Mulloy – challenged the engineers’ decision not to launch
Morton Thiokol – Contracted by NASA to build the Solid Rocket Booster
Alan McDonald – Director of the Solid Rocket Motors Project
Bob Lund – Engineering Vice President
Robert Ebeling – Engineer who worked under McDonald
Roger Boisjoly – Engineer who worked under McDonald
Joe Kilminster – Engineer in a management position
Jerald Mason – Senior Executive who encouraged Lund to reassess his decision not to launch.
Key Dates
1974 – Morton-Thiokol awarded contract to build solid rocket boosters.
1976 – NASA accepts Morton-Thiokol’s booster design.
1977 – Morton-Thiokol discovers joint rotation problem. November 1981 – O-ring erosion
discovered after second shuttle flight. January 24, 1985 – shuttle flight that exhibited the worst
O-ring blow-by. July 1985 – Thiokol orders new steel billets for new field joint design.
August 19, 1985 – NASA Level I management briefed on booster problem.
January 27, 1986 – night teleconference to discuss effects of cold temperature on booster
performance.
January 28, 1986 – Challenger explodes 72 seconds after liftoff.
Background
NASA managers were anxious to launch the Challenger for several reasons, including economic
considerations, political pressures, and scheduling backlogs. Unforeseen competition from the
European Space Agency put NASA in a position where it would have to fly the shuttle
dependably on a very ambitious schedule in order to prove the Space Transportation System’s
cost effectiveness and potential for commercialization. This prompted NASA to schedule a
record number of missions in 1986 to make a case for its budget requests. The shuttle mission
just prior to the Challenger had been delayed a record number of times due to inclement weather
and mechanical factors. NASA wanted to launch the Challenger without any delays so the
1″

launch pad could be refurbished in time for the next mission, which would be carrying a probe
that would examine Halley’s Comet. If launched on time, this probe would have collected data a
few days before a similar Russian probe would be launched. There was probably also pressure to
launch Challenger so it could be in space when President Reagan gave his State of the Union
address. Reagan’s main topic was to be education, and he was expected to mention the shuttle
and the first teacher in space, Christa McAuliffe. The shuttle solid rocket boosters (or SRBs), are
key elements in the operation of the shuttle. Without the boosters, the shuttle cannot produce
enough thrust to overcome the earth’s gravitational pull and achieve orbit. There is an SRB
attached to each side of the external fuel tank. Each booster is 149 feet long and 12 feet in
diameter. Before ignition, each booster weighs 2 million pounds. Solid rockets in general
produce much more thrust per pound than their liquid fuel counterparts. The drawback is that
once the solid rocket fuel has been ignited, it cannot be turned off or even controlled. So it was
extremely important that the shuttle SRBs were properly designed. Morton Thiokol was awarded
the contract to design and build the SRBs in 1974. Thiokol’s design is a scaled-up version of a
Titan missile which had been used successfully for years. NASA accepted the design in 1976.
The booster is comprised of seven hollow metal cylinders. The solid rocket fuel is cast into the
cylinders at the Thiokol plant in Utah, and the cylinders are assembled into pairs for transport to
Kennedy Space Center in Florida. At KSC, the four booster segments are assembled into a
completed booster rocket. The joints where the segments are joined together at KSC are known
as field joints (See Figure 1). These field joints consist of a tang and clevis joint. The tang and
clevis are held together by 177 clevis pins. Each joint is sealed by two O rings, the bottom ring
known as the primary O-ring, and the top known as the secondary O-ring. (The Titan booster had
only one O-ring. The second ring was added as a measure of redundancy since the boosters
would be lifting humans into orbit. Except for the increased scale of the rocket’s diameter, this
was the only major difference between the shuttle booster and the Titan booster.) The purpose of
the O-rings is to prevent hot combustion gasses from escaping from the inside of the motor. To
provide a barrier between the rubber O-rings and the combustion gasses, a heat resistant putty is
applied to the inner section of the joint prior to assembly. The gap between the tang and the
clevis determines the amount of compression on the O-ring. To minimize the gap and increase
the squeeze on the O-ring, shims are inserted between the tang and the outside leg of the clevis.
Launch Delays
The first delay of the Challenger mission was because of a weather front expected to move into
the area, bringing rain and cold temperatures. Usually a mission wasn’t postponed until inclement
weather actually entered the area, but the Vice President was expected to be present for the
launch and NASA officials wanted to avoid the necessity of the Vice President’s having to make
an unnecessary trip to Florida; so they postponed the launch early. The Vice President was a key
spokesperson for the President on the space program, and NASA coveted his good will. The
weather front stalled, and the launch window had perfect weather conditions; but the launch had
already been postponed to keep the Vice President from unnecessarily traveling to the launch
site. The second launch delay was caused by a defective micro switch in the hatch locking
mechanism and by problems in removing the hatch handle. By the time these problems had been
sorted out, winds had become too high. The weather front had started moving again, and
appeared to be bringing record-setting low temperatures to the Florida area. NASA wanted to
check with all of its contractors to determine if there would be any problems with launching in
2″

the cold temperatures. Alan McDonald, director of the Solid Rocket Motor Project at MortonThiokol, was convinced that there were cold weather problems with the solid rocket motors and
contacted two of the engineers working on the project, Robert Ebeling and Roger Boisjoly.
Thiokol knew there was a problem with the boosters as early as 1977, and had initiated a
redesign effort in 1985. NASA Level I management had been briefed on the problem on August
19, 1985. Almost half of the shuttle flights had experienced O-ring erosion in the booster field
joints. Ebeling and Boisjoly had complained to Thiokol that management was not supporting the
redesign task force.
Engineering Design
The size of the gap is controlled by several factors, including the dimensional tolerances of the
metal cylinders and their corresponding tang or clevis, the ambient temperature, the diameter of
the O-ring, the thickness of the shims, the loads on the segment, and quality control during
assembly. When the booster is ignited, the putty is displaced, compressing the air between the
putty and the primary O-ring in volume v1 of Figure 2. The air pressure forces the O-ring into
the gap between the tang and clevis. Pressure loads are also applied to the walls of the cylinder,
causing the cylinder to balloon slightly as shown in Figure 3. (The ballooning effect has been
greatly exaggerated.) This ballooning of the cylinder walls caused the gap between the tang and
clevis gap to open. This effect has come to be known as joint rotation. Morton-Thiokol
discovered this joint rotation as part of its testing program in 1977. Thiokol discussed the
problem with NASA and started analyzing and testing to determine how to increase the O-ring
compression, thereby decreasing the effect of joint rotation. Three design changes were
implemented:
1. Dimensional tolerances of the metal joint were tightened.
2. The O-ring diameter was increased, and its dimensional tolerances were tightened.
3. The use of the shims mentioned above was introduced. Further testing by Thiokol
revealed that the second seal, in some cases, might not seal at all. Additional changes in
the shim thickness and O-ring diameter were made to correct the problem.
A new problem was discovered during November 1981, after the flight of the second shuttle
mission. Examination of the booster field joints revealed that the O-rings were eroding during
flight. The joints were still sealing effectively, but the O-ring material was being eaten away by
hot gasses that escaped past the putty. Thiokol studied different types of putty and its application
to study their effects on reducing O-ring erosion. The shuttle flight 51-C of January 24, 1985,
was launched during some of the coldest weather in Florida history. Upon examination of the
booster joints, engineers at Thiokol noticed black soot and grease on the outside of the booster
casing, caused by actual gas blow-by. This prompted Thiokol to study the effects of O-ring
resiliency at low temperatures. They conducted laboratory tests of O-ring compression and
resiliency between 50lF and 100lF. In July 1985, Morton Thiokol ordered new steel billets which
would be used for a redesigned case field joint. At the time of the accident, these new billets
were not ready for Thiokol, because they take many months to manufacture.
The Night Before the Launch
3″

Temperatures for the next launch date were predicted to be in the low 20°s. This prompted Alan
McDonald to ask his engineers at Thiokol to prepare a presentation on the effects of cold
temperature on booster performance. A teleconference was scheduled the evening before the rescheduled launch in order to discuss the low temperature performance of the boosters. This
teleconference was held between engineers and management from Kennedy Space Center,
Marshall Space Flight Center in Alabama, and Morton-Thiokol in Utah. Boisjoly and another
engineer, Arnie Thompson, knew this would be another opportunity to express their concerns
about the boosters, but they had only a short time to prepare their data for the presentation.1
Thiokol’s engineers gave an hour-long presentation, presenting a convincing argument that the
cold weather would exaggerate the problems of joint rotation and delayed O-ring seating. The
lowest temperature experienced by the O-rings in any previous mission was 53°F, the January
24, 1985 flight. With a predicted ambient temperature of 26°F at launch, the O-rings were
estimated to be at 29°F. After the technical presentation, Thiokol’s Engineering Vice President
Bob Lund presented the conclusions and recommendations. His main conclusion was that 53°F
was the only low temperature data Thiokol had for the effects of cold on the operational
boosters. The boosters had experienced O-ring erosion at this temperature. Since his engineers
had no low temperature data below 53°F, they could not prove that it was unsafe to launch at
lower temperatures. He read his recommendations and commented that the predicted
temperatures for the morning’s launch was outside the data base and NASA should delay the
launch, so the ambient temperature could rise until the O-ring temperature was at least 53°F.
This confused NASA managers because the booster design specifications called for booster
operation as low as 31°F. (It later came out in the investigation that Thiokol understood that the
31°F limit temperature was for storage of the booster, and that the launch temperature limit was
40°F. Because of this, dynamic tests of the boosters had never been performed below 40°F.)
Marshall’s Solid Rocket Booster Project Manager, Larry Mulloy, commented that the data was
inconclusive and challenged the engineers’ logic. A heated debate went on for several minutes
before Mulloy bypassed Lund and asked Joe Kilminster for his opinion. Kilminster was in
management, although he had an extensive engineering background. By bypassing the engineers,
Mulloy was calling for a middle-management decision, but Kilminster stood by his engineers.
Several other managers at Marshall expressed their doubts about the recommendations, and
finally Kilminster asked for a meeting off of the net, so Thiokol could review its data. Boisjoly
and Thompson tried to convince their senior managers to stay with their original decision not to
launch. A senior executive at Thiokol, Jerald Mason, commented that a management decision
was required. The managers seemed to believe the O-rings could be eroded up to one third of
their diameter and still seat properly, regardless of the temperature. The data presented to them
showed no correlation between temperature and the blow-by gasses which eroded the O-rings in
previous missions. According to testimony by Kilminster and Boisjoly, Mason finally turned to
Bob Lund and said, “Take off your engineering hat and put on your management hat.” Joe
Kilminster wrote out the new recommendation and went back on line with the teleconference.
The new recommendation stated that the cold was still a safety concern, but their people had
found that the original data was indeed inconclusive and their “engineering assessment” was that
launch was recommended, even though the engineers had no part in writing the new
recommendation and refused to sign it. Alan McDonald, who was present with NASA
management in Florida, was surprised to see the recommendation to launch and appealed to
NASA management not to launch. NASA managers decided to approve the boosters for launch
4″

despite the fact that the predicted launch temperature was outside of their operational
specifications.
The Launch
During the night, temperatures dropped to as low as 8°F, much lower than had been anticipated.
In order to keep the water pipes in the launch platform from freezing, safety showers and fire
hoses had been turned on. Some of this water had accumulated, and ice had formed all over the
platform. There was some concern that the ice would fall off of the platform during launch and
might damage the heat resistant tiles on the shuttle. The ice inspection team thought the situation
was of great concern, but the launch director decided to go ahead with the countdown. Note that
safety limitations on low temperature launching had to be waived and authorized by key
personnel several times during the final countdown. These key personnel were not aware of the
teleconference about the solid rocket boosters that had taken place the night before. At launch,
the impact of ignition broke loose a shower of ice from the launch platform. Some of the ice
struck the left-hand booster, and some ice was actually sucked into the booster nozzle itself by an
aspiration effect. Although there was no evidence of any ice damage to the Orbiter itself, NASA
analysis of the ice problem was wrong. The booster ignition transient started six hundredths of a
second after the igniter fired. The aft field joint on the right-hand booster was the coldest spot on
the booster: about 28°F. The booster’s segmented steel casing ballooned and the joint rotated,
expanding inward as it had on all other shuttle flights. The primary O-ring was too cold to seat
properly, the cold-stiffened heat resistant putty that protected the rubber O-rings from the fuel
collapsed, and gases at over 5000°F burned past both O-rings across seventy degrees of arc.
Eight hundredths of a second after ignition, the shuttle lifted off. Engineering cameras focused
on the right-hand booster showed about nine smoke puffs coming from the booster aft field joint.
Before the shuttle cleared the tower, oxides from the burnt propellant temporarily sealed the field
joint before flames could escape. Fifty-nine seconds into the flight, Challenger experienced the
most violent wind shear ever encountered on a shuttle mission. The glassy oxides that sealed the
field joint were shattered by the stresses of the wind shear, and within seconds flames from the
field joint burned through the external fuel tank. Hundreds of tons of propellant ignited, tearing
apart the shuttle. One hundred seconds into the flight, the last bit of telemetry data was
transmitted from the Challenger.
Issues For Discussion
The Challenger disaster has several issues which are relevant to engineers. These issues raise
many questions which may not have any definite answers, but can serve to heighten the
awareness of engineers when faced with a similar situation. One of the most important issues
deals with engineers who are placed in management positions. It is important that these
managers not ignore their own engineering experience, or the expertise of their subordinate
engineers. Often a manager, even if she has engineering experience, is not as up to date on
current engineering practices as are the actual practicing engineers. She should keep this in mind
when making any sort of decision that involves an understanding of technical matters. Another
issue is the fact that managers encouraged launching due to the fact that there was insufficient
low temperature data. Since there was not enough data available to make an informed decision,
this was not, in their opinion, grounds for stopping a launch. This was a reversal in the thinking
5″

that went on in the early years of the space program, which discouraged launching until all the
facts were known about a particular problem. This same reasoning can be traced back to an
earlier phase in the shuttle program, when upper-level NASA management was alerted to
problems in the booster design, yet did not halt the program until the problem was solved. To
better understand the responsibility of the engineer, some key elements of the professional
responsibilities of an engineer should be examined. This will be done from two perspectives: the
implicit social contract between engineers and society, and the guidance of the codes of ethics of
professional societies. As engineers test designs for ever-increasing speeds, loads, capacities and
the like, they must always be aware of their obligation to society to protect the public welfare.
After all, the public has provided engineers, through the tax base, with the means for obtaining
an education and, through legislation, the means to license and regulate themselves. In return,
engineers have a responsibility to protect the safety and well-being of the public in all of their
professional efforts. This is part of the implicit social contract all engineers have agreed to when
they accepted admission to an engineering college. The first canon in the ASME Code of Ethics
urges engineers to “hold paramount the safety, health and welfare of the public in the
performance of their professional duties.” Every major engineering code of ethics reminds
engineers of the importance of their responsibility to keep the safety and well being of the public
at the top of their list of priorities. Although company loyalty is important, it must not be allowed
to override the engineer’s obligation to the public. Marcia Baron, in an excellent monograph on
loyalty, states: “It is a sad fact about loyalty that it invites…single-mindedness. Single-minded
pursuit of a goal is sometimes delightfully romantic, even a real inspiration. But it is hardly
something to advocate to …
Purchase answer to see full
attachment

How it works

  1. Paste your instructions in the instructions box. You can also attach an instructions file
  2. Select the writer category, deadline, education level and review the instructions 
  3. Make a payment for the order to be assignment to a writer
  4.  Download the paper after the writer uploads it 

Will the writer plagiarize my essay?

You will get a plagiarism-free paper and you can get an originality report upon request.

Is this service safe?

All the personal information is confidential and we have 100% safe payment methods. We also guarantee good grades

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more

Order your essay today and save 20% with the discount code ESSAYHELP